Title: | DETERMINANT OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECTS (CASE OF HEBRON CONSTRUCTION COMPANY.) |
Authors: | SHMELS, BNORAYEHU |
Keywords: | Likert scale, cost overrun. Time overrun, Construction Project, Political Instability. Design Change. |
Issue Date: | Jun-2023 |
Publisher: | St. Mary’s University |
Abstract: | The study aims to identify determinate of cost and time overrun the case of Hebron Construction
Company. The study was look sociopolitical, economic, and managerial and construction
technique and design changes are major causes for the occurrences of cost and time overrun. This
study also used descriptive and explanatory research design and quantitative research approach
were used and the primary sources of data were collected from 74 respondents in Hebron
Construction Company. The sampling techniques used in this study were census sampling method.
For data analysis Multiple Regression and Descriptive statistics were used. The result of this study
were indicated that sociopolitical, economical. managerial and construction techniques and
design changes were identified as causes of cost and time overrun in Hebron Construction project
.Finally this study recommended that Hebron Construction Company the concerned body to
provide a good planning and scheduling are continuing process during construction and match
with the resources and time to develop the work avoid cost and time overrun. |