Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/8249
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDawit, Kidus-
dc.date.accessioned2025-06-11T13:37:58Z-
dc.date.available2025-06-11T13:37:58Z-
dc.date.issued2024-06-
dc.identifier.urihttp://hdl.handle.net/123456789/8249-
dc.description.abstractThe goal of this study is to investigate how the Kaliti prefabricated house project is affected by project management knowledge domains, namely the iron triangle of cost, time, and scope. The study especially attempts to investigate and characterize the relationship between performance indicators of Kaliti Prefab housing and project cost management elements, project time management factors, and project scope management variables. The study used a quantitative research methodology and a causal research design. 37 structured, closed-ended survey questions were used in the survey, which was given to consultants and contractors working on Kaliti building construction projects. The causal link between variables influencing project performance and project performance indicators (construction cost, construction duration, and construction scope) was investigated using descriptive and multiple regression statistical techniques. The results of the regression analysis demonstrated that the building construction projects at Kaliti Prefabricated Housing are favorably and strongly impacted by project scope, project time, and project cost management aspects. Because of this, the study suggested that in order to improve the effectiveness, efficiency, and caliber of building construction projects at the Kaliti site, consultants and contractors should truly focus on resolving the correlates of project performances.en_US
dc.language.isoenen_US
dc.publisherSt. Mary’s Universityen_US
dc.subjectproject cost management factors, project time management factors, project scope management factors, project performance indicators, iron- triangle, and Kaliti prefab-housing project.en_US
dc.titleTHE EFFECT OF PROJECT MANAGEMENT KNOWLEDGE AREAS ON THE PERFORMANCE OF KALITI PREFABRICATED HOUSING PROJECTen_US
dc.typeThesisen_US
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
AFTER COMMENT KIDUS2 (2).pdf1.06 MBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.