Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/8238
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFIKREMARIAM, ENDRIAS-
dc.date.accessioned2025-06-11T12:53:46Z-
dc.date.available2025-06-11T12:53:46Z-
dc.date.issued2024-05-
dc.identifier.urihttp://hdl.handle.net/123456789/8238-
dc.description.abstractThe purpose of this study is to assess project implementation practices and challenges in the case of Lideta Sub City B+G+12 story Office Building Construction project. The study adopts a descriptive case study design and utilizes non-probability sampling techniques, such as judgmental and quota sampling. The participants include project management team members, contractors, and consultants involved in the office building project owned by Addis Ababa Design and Construction Works Bureau on behalf of Lideta sub city. Data is collected through interviews and questionnaires, and both qualitative and quantitative analysis methods are employed. A survey was conducted by using 55 structured close ended questions which were distributed to 7 contractors, 3 consultants and 10 owners of building construction projects. The analysis is done qualitatively by relating the results with literatures and quantitatively using descriptive percentage, mean and standard deviation statistical tools were used to assess the implementation practices and challenges of the project. The findings of the study revealed that the assessment of knowledge areas shows a high level of mean value. To conclude the analysis showed that a good management practices of knowledge areas. Thus, this study recommended that the project should continue with this performance until completion of the project.en_US
dc.language.isoenen_US
dc.publisherSt. Mary’s Universityen_US
dc.subjectProject implementation, Construction project, Practices, Challenges, Case studyen_US
dc.titleAssessment of project implementation practices and challenges: The case of Lideta Sub City Office Building Construction project.en_US
dc.typeThesisen_US
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
Final Thesis.pdf1.25 MBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.